IMOS - Rescheduling Voyages

Home > Operations > Rescheduling Voyages


Configuration flag CFGAllowOpsVoyageRenumbering enables voyage rescheduling; you must also have the Edit Voyage Number Module Right.

You cannot reschedule voyages if there are any posted transactions in the Voyage Invoice List. You must reverse the posted invoices before attempting to reschedule.

With the Reschedule Voyage form, you can do any of the following:

  • Move one voyage's itinerary to the itinerary of another vessel.

  • Select a range of consecutive voyages for one vessel and reschedule them as a group to another point on the schedule of the same vessel or another vessel.

  • Swap two voyage itineraries, either of the same vessel or of two different vessels.

Rescheduling One Voyage

  1. On the Voyages list, click the row of the voyage you want to reschedule. In this example, we will choose 1409.

  2. The Voyage Manager appears. On the toolbar, click   Copy Button.png  and then click Reschedule Voyage.

    Ops-Voyage Manager-Reschedule Voyage Dialog.png
  3. In the New Vessel/Voyage fields, select the vessel and voyage number whose schedule you want to apply to the Current Vessel/Voyage. The New Vessel can be a different voyage from the Current Vessel.

    Ops-Voyage Manager-Reschedule Voyage Dialog-Step 2 .png
  4. Click OK. Voyage 1409 is rescheduled as voyage 1410. The previous voyage 1409 is moved up one space in the Voyages list and renumbered 1410.

Rescheduling Multiple Voyages

You can reschedule a group of consecutive voyages to another point on the schedule of the same vessel or to another vessel. All voyages in the group must be consecutive.

  1. On the Voyages list, click the row for the first voyage in the group you want to reschedule.

  2. The Voyage Manager appears. On the toolbar, click Copy Button.png  and then click Reschedule Voyage.

  3. On the Reschedule Voyage form, in the To field, enter the voyage number where the range of vessels to be rescheduled ends.

  4. In the New Vessel/Voyage fields, select the vessel and voyage number where you want the range of vessels to be rescheduled.

    Ops-Voyage Manager-Reschedule Voyage Dialog-Multiple Voyages.png


    • The Consecutive check box only affects the status of the first voyage in the batch.

  5. Click OK. Voyages 1409 through 1411 are rescheduled as consecutive voyages beginning at voyage 1410. The previous voyage is moved up and renumbered.

Swapping Voyages

To swap two scheduled voyages, select the Swap check box on the Reschedule Voyage form. You can only swap one voyage with another; you cannot swap a group of voyages.

  1. On the Voyages list, click the row of the voyage you want to swap.

  2. The Voyage Manager appears. On the toolbar, click Copy Button.png  and then click Reschedule Voyage.

  3. In the New Vessel/Voyage field, select the vessel and voyage you want to swap the current voyage with.

  4. Select the Swap check box.

    Ops-Voyage Manager-Reschedule Voyage Dialog-Swap Voyages.png
  5. Click OK. The two voyage itineraries are swapped.

Related Configuration Flags

Name/Flag

Description

Allow Operations Voyage Renumbering
CFGAllowOpsVoyageRenumbering

When enabled, users can specify a new Voyage Number for a voyage by modifying the corresponding field in the Voyage Manager or the Voyage Fixture, or by rescheduling the voyage via the the Voyage Manager Copy toolbar button. In addition, the Edit Voyage Number Module Right appears, allowing this ability to be granted to certain users but not others.